
100% Pass Your E_S4HCON2020 Exam Dumps at First Attempt with TroytecDumps
Penetration testers simulate E_S4HCON2020 exam PDF
NEW QUESTION 29
In ICNV. How database operations synchronized between the source and the target table?
- A. Deletes are directly executed in the target table by delete trigger.
- B. AA
Answer: A
NEW QUESTION 30
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.
The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
Please choose the correct answer.
Response:
- A. The number of CPU cores does not allow more than 40 R3load processes to be run in parallel.
- B. These are 40 pairs of R3load processes, so there are 80 R3load processes running.
- C. There is a maximum of 40 parallel R3load processes within this specific downtime phase.
- D. SUM is still running in uptime; the number of 40 defined R3load processes is considered.
Answer: B
NEW QUESTION 31
During a SUM run you vivant to check if the phase SHADOW_IMPORT_INC is still running properly.
Where can you find information about this?
There are 2 correct answers to this question.
Response:
- A. Check for running R3load processes on the host of the primary application server
- B. Check for running R3trans processes on the host of the primary application server
- C. Check for the latest log files in the SUM directory, subdirectory ABAP, subdirectory tmp
- D. Check for running batch jobs in the shadow system via Job Overview (SM37)
Answer: B,C
NEW QUESTION 32
You are performing an SAP S/4HANA conversion for your production system. This conversion requires that certain business functions are switched on.
Following SAP recommendations, how will you achieve this?
There are 2 correct answers to this question.
Response:
- A. Activate the required business functions manually in the production system.
- B. During conversion, SUM delivers some business functions already activated.
- C. Import a transport request from the development system that contains the recording of the activation.
- D. Specify the business functions that need to be switched on during the prepare part of SUM.
Answer: B,C
NEW QUESTION 33
Which circumstances will allow SUM to run without the creation of a shadow system?
Please choose the correct answer.
Response:
- A. Using the database migration option (DMO) for SUM
- B. Using the main configuration option "Standard" when applying SAP Support Packages
- C. Using the main configuration option "Single System" in case of an upgrade
- D. Using the main configuration option "Single System" when installing an Add-On
Answer: D
NEW QUESTION 34
What phases of SUM will be executed during an SAP S/4HANA conversion including DMO?
There are 3 correct answers to this question.
Response:
- A. Phase RUN_RSDBSCPY
- B. Phases DIFF*
- C. Phase DOWNCONF_DTTRANS
- D. Phase RUN_RSPTBFIL _ISUTABU
- E. Phases EU_IMPORT*
Answer: B,C,E
NEW QUESTION 35
You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.
What does the "Calculated level" indicate for those software components?
Please choose the correct answer.
Response:
- A. The SAP Support Packages that will be bound to the upgrade
- B. The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner
- C. The SAP Support Packages contained in the upgrade media
- D. The SAP Support Packages found in the download directory
Answer: D
NEW QUESTION 36
You want to execute a Unicode Conversion only. Which approach do you need to follow?
Please choose the correct answer.
Response:
- A. SUM without DMO
- B. SWPM using the Load procedure
- C. SWPM using the Backup / Restore procedure
- D. SUM with DMO
Answer: B
NEW QUESTION 37
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
Response:
- A. An SAP S/4HANA conversion is performed, without adapting the customer data.
- B. An upgrade of the software components is performed, without changing the database type.
- C. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
- D. A change of the database type is performed, without changing the software components.
Answer: D
NEW QUESTION 38
Which preparational steps must be performed for an SAP S/4HANA conversion?
There are 2 correct answers to this question.
Response:
- A. Install add-on SAP Gateway 7.50
- B. Uninstall Fiori apps not released for SAP_UI 7.50
- C. Uninstall industry extensions not supported by SAP S/4HANA
- D. Delete client 066 (Early Watch Client)
Answer: B,D
NEW QUESTION 39
How does SUM recognize modification adjustment transports from predecessor systems?
Please choose the correct answer.
Response:
- A. By searching for transport requests in DIR_TRANS, subdirectory "transport"
- B. By searching for transport requests named <SID>K0<number>
- C. By searching for transport requests that are assigned to the project SAP_ADJUST
- D. By searching for transport requests in the file umodauto.Ist
Answer: A
NEW QUESTION 40
During a DMO procedure with SUM, after which phase is the repository first available on the target database?
Please choose the correct answer.
Response:
- A. Downtime migration (EU_CLONE_MIG_DT_RUN)
- B. ParaUel distribution (PARDIST_SHD)
- C. Uptime migration (EU_CLONE_MIG_UT_RUN)
- D. Shadow repository creation (EU_IMPORT*)
Answer: C
NEW QUESTION 41
You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?
Please choose the correct answer.
Response:
- A. After the SUM roadmap step "Postprocessing" and post procedure steps are finished
- B. During the SUM roadmap step "Postprocessing", in parallel with post procedure steps
- C. After the SUM roadmap step "Execution" is finished and before "Postprocessing"
- D. During the SUM roadmap step "Postprocessing", after the post procedure steps are complete
Answer: A
NEW QUESTION 42
You are planning to upgrade your SAP ECC 6.07 system running on a single codepage (SCP) to SAP ECC
6.08. What is the recommended option to perform this upgrade?
Please choose the correct answer.
Response:
- A. Perform the Unicode conversion before the upgrade to SAP ECC 6.08.
- B. Perform the upgrade to SAP ECC 6.08 before the Unicode conversion.
- C. Combine the upgrade and the Unicode conversion using the Twin Upgrade & Unicode Conversion (TU
& UC) procedure. - D. Combine the upgrade and the Unicode conversion using the Combined Upgrade & Unicode Conversion (CU & UC) procedure.
Answer: A
NEW QUESTION 43
Regarding an SAP Upgrade, What does the major SAP Note for the version of SUM you are using usually contain?
- A. The corrections to the SUM Guide
- B. The link to different patch levels to SUM
- C. AA
- D. An overview about possible upgrade paths
Answer: A,B,D
NEW QUESTION 44
You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?
Please choose the correct answer.
Response:
- A. Early in the downtime
- B. At the end of the downtime
- C. Before the downtime starts
- D. As part of the cleanup process
Answer: C
NEW QUESTION 45
The SUM procedure stops with an error during uptime. How can you identify the current phase, the one in which SUM encountered an error?
There are 2 correct answers to this question.
Response:
- A. Check the messages shown by the SUM UI
- B. Check the system log (transaction SM21) of the SAP system
- C. Check the most recent entries shown in file sapevt.trc
- D. Check the most recent entries in SAPup.log
Answer: A,D
NEW QUESTION 46
You are running an SAP ECC system. For which of the following activities does SUM allow you to use the Near Zero Downtime Maintenance (NZDM) capabilities?
There are 3 correct answers to this question.
Response:
- A. Perform an SAP S/4HANA conversion including DMO.
- B. Use DMO for SUM.
- C. Apply SAP Support Packages.
- D. Upgrade the SAP system.
- E. Apply an Enhancement Package.
Answer: C,D,E
NEW QUESTION 47
You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?
There are 2 correct answers to this question.
Response:
- A. Check the compatibility of custom code with SAP S/4HANA
- B. Apply the recommendations of the simplification list
- C. Run the database migration to the SAP HANA database
- D. Perform the migration of data into the new data structure
Answer: A,B
NEW QUESTION 48
Which are valid options to check the progress of the database migration in a Microsoft Windows environment?
There is correct answers to this question.
Response:
- A. Check the log files written under "SUM\abap\log"
- B. Check the dump size of the database export on disk
- C. Check logs for jobs starting with "RSUPG_SGEN" in the system
- D. Check the "Charts Control Center" in the SUM UI
Answer: D
NEW QUESTION 49
What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?
Please choose the correct answer.
- A. An SAP S/4HANA conversion is performed, without adapting the customer data.
- B. An upgrade of the software components is performed, without changing the database type.
- C. A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.
- D. A change of the database type is performed, without changing the software components.
Answer: D
NEW QUESTION 50
......
All E_S4HCON2020 Dumps and Training Courses: https://www.troytecdumps.com/E_S4HCON2020-troytec-exam-dumps.html