SAP C-TS422-2020 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Explain and compare the different production methods in make-to-order
  • Determine BOM item category, describe order status management and set user statuses
Topic 2
  • Introduction to SAP S/4HANA Supply Chain Planning
  • Identify features for Good Manufacturing Practices (GMP)
Topic 3
  • Outline production planning components and functions, differentiate consumption-based planning vs. MRP
  • Identify repetitive manufacturing specific master data
Topic 4
  • Select and apply planning strategies, use the planning table, characterize long-term planning
  • Determine master data objects for process orders
Topic 5
  • Outline both motivation and background of SAP S/4HANA
  • Detailed scheduling planning board) and advanced planning
Topic 6
  • Describe the SAP HANA database concept and new user experience with SAP Fiori
  • Explain line load planning and confirmation, outline Kanban master data and Kanban processes


C-TS422-2020 Exam Certification Details:

Cut Score:56%
Exam:80 questions
Level:Associate
Duration:180 mins

 

NEW QUESTION 36
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?

  • A. Plant Data
  • B. MRP Profile
  • C. MRP Controller
  • D. MRP Group

Answer: D

 

NEW QUESTION 37
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?

  • A. The cross-plant status
  • B. The most restrictive status
  • C. The plant-specific status
  • D. The least restrictive status

Answer: B

 

NEW QUESTION 38
Which time elements can be reduced by a reductionstrategy? Note: There are 3 correct answers to this question.

  • A. Wait time
  • B. Goods receipt processing time
  • C. Queue time
  • D. Float after production
  • E. Move time

Answer: C,D,E

 

NEW QUESTION 39
MRP created a planned order for a material that has one single material from stock as a component. What happens to this dependent requirement when you convert the planned order into a production order?

  • A. It is converted into a schedule line.
  • B. It is converted into a production order.
  • C. It is converted into a reservation.
  • D. It is converted into a planned order.

Answer: C

 

NEW QUESTION 40
What does it mean for the production planner when MRP works with infinite capacities?

  • A. MRP assigns capacity requirements automatically to work center is with the earliest available capacity.
  • B. MRP assigns capacity requirements automatically after the last scheduled order on a work center.
  • C. MRP creates capacity requirements only if the work center has sufficient capacity.
  • D. MRP creates capacity requirements without checking the capacity of a work center.

Answer: D

 

NEW QUESTION 41
You want to insert an operation at a certain time on a work center. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched. How does the insertion take place?

  • A. The previously dispatched operation stays as is the new operation is insertedafter the dispatched operation.
  • B. The previously dispatched operation stays assist the new operation is inserted before the dispatched operation.
  • C. The new operation is inserted at the desired time; the previously dispatched operation is moved forward.
  • D. The new operation is inserted at the desired time the previously dispatched operation is moved backward.

Answer: D

 

NEW QUESTION 42
What determines whether the planned independent requirements in MRP consume other requirements?

  • A. Requirements profile
  • B. Consumption sequence procedure
  • C. Requirements type
  • D. Order type

Answer: C

 

NEW QUESTION 43
How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question.

  • A. By industry
  • B. By period
  • C. By material type
  • D. By plant

Answer: B,D

 

NEW QUESTION 44
Which of the following is a valid sequence of the main activities in product on order processing?

  • A. Creation, scheduling, release, variance calculation, confirmation
  • B. Creation, release, scheduling, material withdrawal, confirmation
  • C. Creation, staging, release, material withdrawal, confirmation
  • D. Creation, scheduling, release, material withdrawal, confirmation

Answer: D

 

NEW QUESTION 45
What are the consequences when you assign a planned order to a production line manually, using the planning table in repetitive manufacturing?

  • A. The planned order is converted to a production order.
  • B. The planned order's components are copied from the picking list.
  • C. The planned order's component availability is checked
  • D. The planned order generates capacity requirements.

Answer: D

 

NEW QUESTION 46
In your project,you have several materials that are planned by different people. How can you assign the planning responsibility?

  • A. MRP group
  • B. MRP controller
  • C. MRP planning file
  • D. MRP type

Answer: B

 

NEW QUESTION 47
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Functional Location BOM
  • B. Class BOM
  • C. Work Center BOM
  • D. Sales Order BOM

Answer: A,D

 

NEW QUESTION 48
How can you carry out cost object controlling for production orders? Note: There are 2 correct answers to this question.

  • A. Product-related
  • B. Cost-related
  • C. Order-related
  • D. Milestone-related

Answer: A,C

 

NEW QUESTION 49
You want to reduce planning efforts for B/C materials. Which planning procedure do you recommend?

  • A. Forecast planning
  • B. Consumption-based planning
  • C. Manual planning without check
  • D. Material requirements planning

Answer: B

 

NEW QUESTION 50
For a production version to be valid and consistent what requirements must be fulfilled? Note: There are 3 correct answers to this question.

  • A. Thedeletion flag must NOT be set for the bill of materials (BOM) or the routing.
  • B. The lot size range must be within the lot-size range of the assigned routing.
  • C. The assigned routing and bill of materials (BOM) must be valid in the entire validity period.
  • D. The assigned routing must NOT have alternative sequences.
  • E. The assigned routing must be a rate routing.

Answer: A,B,C

 

NEW QUESTION 51
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

  • A. When multiple planned orders exists in one resource
  • B. When alternate resourcesare used within one operation
  • C. When multiple production versions are maintained for one product
  • D. When multiple operations are maintained for one product

Answer: B

 

NEW QUESTION 52
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?

  • A. Scheduling working time only
  • B. Squeezing
  • C. Insert operation
  • D. Find Slot

Answer: D

 

NEW QUESTION 53
Which of the following elements does MRP take into account during net requirement calculation? Note: There are 2 correct answers tothis question.

  • A. Maximum stock level
  • B. Lot size
  • C. Purchase orders
  • D. Safety stock

Answer: B,D

 

NEW QUESTION 54
What is the difference between co-products and by-products?

  • A. Only by-products have a zero inventory valuation.
  • B. Onlyco-products can be manufactured in isolation from the main product.
  • C. Only co-products appear in the processor production order settlement rule.
  • D. Only co-products are identified by a special item category in the bill of material (BOM).

Answer: C

 

NEW QUESTION 55
......