
Real C-IBP-2211 dumps - Real SAP dumps PDF in here [Dec-2023]
Realistic TroytecDumps C-IBP-2211 Dumps PDF - 100% Passing Guarantee
SAP C-IBP-2211 certification exam is a computer-based test that consists of 80 multiple-choice questions. Candidates have three hours to complete the exam and must achieve a minimum score of 68% to pass. C-IBP-2211 exam is available in multiple languages and can be taken at authorized testing centers or online. SAP Certified Application Associate - SAP IBP for Supply Chain (2211) certification is valid for two years, after which candidates are required to recertify to maintain their credential.
NEW QUESTION # 12
You are adding a value-based filter to a planning view.Which of the following conditions apply?Note: There are 3 correct answers to this question.
- A. The alerts dashboard is not available if a value-based filter is set for the open planning view.
- B. You can add (or delete) planning objects to a planning view after these filters are applied.
- C. These filters can be used together with attribute totals in the same planning view.
- D. These filters are always applied based on the values stored in the database.
- E. You can only apply one value-based filter per planning view.
Answer: A,D,E
NEW QUESTION # 13
Which conditions have to be fulfilled as a prerequisite to maintain a key figure disaggregation?Note: There are 2 correct answers to this question.
- A. The key figure is stored and system editable.
- B. The key figure is calculated and system editable.
- C. The key figure is stored and all editable.
- D. The key figure is calculated and all editable.
Answer: C
NEW QUESTION # 14
A time profile is defined with these levels: day, technical week, week, month, quarter, and year. What condition in configuration will allow you to have a different value in the current week, versus all other time buckets?
- A. IF("PERIODID5" ="$$PERIODID5CU$$...)
- B. IF("PERIODID2" ="$$PERIODID2CU$$...)
- C. IF("PERIODID4" ="$$PERIODID4CU$$...)
- D. IF("PERIODID3" ="$$PERIODID3CU$$...)
Answer: D
NEW QUESTION # 15
Which of the following are capabilities of the Manage Forecast Error Calculations - Inventory Optimization app?Note: There are 2 correct answers to this question.
- A. Adjust for forecast bias in Forecast Error CV calculations
- B. Propagate forecast error to upstream locations in a supply chain network
- C. Adjust Safety Stock Recommendations based on forecast error CV input
- D. Identifiy intermittent demand for Forecast Error CV calculations
Answer: A,C
NEW QUESTION # 16
Which of these conditions must be met to create a Local Member key figure?Note: There are 2 correct answers to this question.
- A. Users should have authorization for template administration.
- B. Use Excel Cell References in the Report Editor option is selected.
- C. A key figure is selected in the Key Figures tab in the SAP IBP, add-in for Microsoft Excel.
- D. Activate Local Member Recognition setting is selected.
Answer: A,D
NEW QUESTION # 17
Forecast Error CV is an input to which of the following?
- A. Time-Series-Based Supply Planning Optimizer
- B. Calculate Target Inventory Components in Inventory Planning Profile Operator
- C. Forecast Error Calculation in Inventory Planning Profile Operator
- D. Multistage Inventory Optimization in Inventory Planning Profile Operator
Answer: D
NEW QUESTION # 18
You are working on a mid-range plan that spans the seasonal peak and you are evaluating the need for additional crewing.Which of the following parameters can you model to plan production with extra shift(s)?
- A. Incremental production values
- B. Production source validity at the start of seasonal peak
- C. Adjusted production interactive values
- D. Capacity expansion with additional costs
Answer: D
NEW QUESTION # 19
Which of the following key functions are supported by SAP IBP for sales and operations?Note: There are
2 correct answers to this question.
- A. Time series analysis
- B. Scenario analysis for operational supply planning
- C. Multi-Level Supply Planning Heuristics
- D. Simple statistical forecast
Answer: C,D
NEW QUESTION # 20
Safety Stock outputs from Multistage Inventory Optimization are sent to which of these processes? Note: There are 2 correct answers to this question.
- A. Decoupling Points determination in SAP IBP for demand-driven replenishment
- B. Charts creation in SAP Supply Chain Control Tower
- C. Supply Heuristics in SAP IBP for sales and operations
- D. Demand Sensing with Gradient Boosting (Full)
Answer: C,D
NEW QUESTION # 21
What function would you use to configure a year-to-date calculation?
- A. Dynamic Rolling Aggregation
- B. Rolling Aggregation
- C. Cumulative Aggregation
- D. Last Period Aggregation
Answer: C
NEW QUESTION # 22
Which conditions have to be fulfilled as a prerequisite to maintain a key figure disaggregation?Note:
There are 2 correct answers to this question.
- A. The key figure is stored and system editable.
- B. The key figure is calculated and system editable.
- C. The key figure is stored and all editable.
- D. The key figure is calculated and all editable.
Answer: A,C
NEW QUESTION # 23
What are some of the properties of filter blocks?Note: There are 3 correct answers to this question.
- A. Filter blocks are imposed when modeling attribute transformations.
- B. Filter blocks are imposed when modeling an attribute as a key figure.
- C. Filter blocks can be visualized in SAP IBP, add-in for Microsoft Excel
- D. Filter blocks can be visualized in the Key Figure Calculations app.
- E. Filter blocks are imposed when modeling cross-period calculations.
Answer: A,B,C
NEW QUESTION # 24
Which parts of the S&OP high-level process would the Inventory planning and optimization process fit into?Note: There are 2 correct answers to this question.
- A. Reconciliation Review, by providing inventory parameters for one consolidated plan
- B. Demand Review, by using the output of demand planning as input into calculations
- C. Management business Review, by providing the inventory targets for endorsement
- D. Supply Review, by providing an input to supply network planning
Answer: A,C
NEW QUESTION # 25
You have set up a planning area, and data is now available. You adjust the necessary time profile settings and run a consistency check.Which settings can you change and still run a successful consistency check?Note: There are 2 correct answers to this question.
- A. Change the numbering hierarchy of the period IDs in the time profile.
- B. Add a new time profile level to the time profile.
- C. Change the description of the attributes in the time profile.
- D. Change the past and future horizon of the levels in the time profile.
Answer: C,D
NEW QUESTION # 26
You are modeling a new product introduction.Which of the following steps can be part of your modeling process in the Manage Product Lifecycle app?Note: There are 2 correct answers to this question.
- A. Enter the product family to which the new product belongs
- B. Copy the launch dimension from the reference product to the new product
- C. Enter the Phase-out Start Date and Phase-out End Date
- D. Create planning objects for new combinations in the app
Answer: B,D
NEW QUESTION # 27
What are some of the prerequisites for configuring a planning area that results in a successful consistency check?Note: There are 2 correct answers to this question.
- A. Configure at most two input key figures on the same planning level in a key figure calculation.
- B. Assign the compound master data type and its component master data types.
- C. Specify a planning horizon in the planning area for each level of the assigned time profile.
- D. Configure at least one calculated key figure for the planning area.
Answer: B,C
NEW QUESTION # 28
You are working with inventory key figures.What are some of the business scenarios where you can use the Last Period Aggregation function?Note: There are 2 correct answers to this question.
- A. Calculating the value of inventory on any time profile level ensuring flexibility of calculation
- B. Calculating how many periods inventory is going to last based on the planned demand
- C. Search for and return the last not null value of the inventory key figure
- D. Calculating the value of inventory on a weekly basis, using static aggregation from the daily level
Answer: B,C
NEW QUESTION # 29
Which of the following are inputs to Demand Sensing with Gradient Boosting (Full) algorithm?Note: There are 2 correct answers to this question.
- A. Future Consensus Forecasts and Lagged Forecast Snapshots
- B. Recommended Safety Stocks from Multistage Inventory Optimization
- C. Forecast Error CV Calculated by Manage Forecast Error Calculations app
- D. Sales Order Quantities (both historical and future open orders)
Answer: A,B
NEW QUESTION # 30
Which of the following are examples of time-independent key figures?Note: There are 2 correct answers to this question.
- A. A unit of measure key figure, such as UOMCONVERSIONFACTOR
- B. A forecast metric key figure, such FCSTMAPE
- C. A special key figure marked as an aggregate key figure (aggregate constraint)
- D. A currency conversion key figure, such as exchange rate
Answer: A,C
NEW QUESTION # 31
......
Verified C-IBP-2211 dumps Q&As Latest C-IBP-2211 Download: https://www.troytecdumps.com/C-IBP-2211-troytec-exam-dumps.html
Free SAP C-IBP-2211 Exam Questions and Answer: https://drive.google.com/open?id=1IPyYxX0wHADADCLDZdX_vgKJRWWSBvHh