[Q190-Q206] Excellent MB-330 PDF Dumps With 100% TroytecDumps Exam Passing Guaranted [Nov-2023]

Share

Excellent MB-330 PDF Dumps With 100% TroytecDumps Exam Passing Guaranted [Nov-2023]

100% Pass Your MB-330 Microsoft Dynamics 365 Supply Chain Management Functional Consultant at First Attempt with TroytecDumps

NEW QUESTION # 190
You need to configure the system to support the pottery line.
What should you do first?

  • A. Create a new product master with pre-defined product variants.
  • B. Set up a new product with product configuration.
  • C. Create a new product with tracking dimensions.
  • D. Create a new product with storage dimensions.

Answer: A

Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/tasks/create-predefined-product-variants


NEW QUESTION # 191
A company must set up replenishment of inventory using vendor-owned consignment inventory.
You need to create the replenishment order.
How should you complete the replenishment order? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/inventory/tasks/create-consignment-replenishment-order


NEW QUESTION # 192
A company is implementing Dynamics 365 Supply Chain Management.
The company wants to configure the quality orders and nonconformances for the following tasks:
* Recording timesheets associated with repair costs
* Documenting outcomes of test results
* Creating a certificate of analysis
You need to configure the features for these tasks.
What should you configure? To answer, drag the appropriate features to the correct tasks. Each feature may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation
Graphical user interface, text, application Description automatically generated


NEW QUESTION # 193
You are a functional consultant for a company named Contoso Entertainment System USA (USMF).
You plan to manage safety stock level.
You need to configure a minimum stock level of 1,500 units for an item named StandardSpeakerUpSel in warehouse number 13.To complete this task, sign in to Dynamics 365 portal.

Answer:

Explanation:
See explanation below.
Explanation
Select Product information management > Products > Released products and then select the product (StandardSpeakerUpSel), and then on the Action Pane, in the Plan tab, in the Coverage group, select Item coverage to open the Item coverage page.
Select Min/Max in for the Coverage code and enter the value 1,500 for the Minimum value.

Reference:
https://docs.microsoft.com/en-us/learn/modules/configure-use-master-planning-dyn365-supply-chain-mgmt/02-s


NEW QUESTION # 194
You need to configure the system to support regional sales requirements.
Which group assignments should you use? To answer, select the appropriate options in the answer area.
NOTE. Each correct selection is worth one point.

Answer:

Explanation:

Reference:
https://www.dynamics-tips.com/sales-and-marketing/how-to-calculate-and-process-sales-commissions


NEW QUESTION # 195
A company plans to stock new items and value those items by using FIFO principle. The company has multiple sites set up. There are multiple warehouses for each site.
You must be able to view the value and quantity of these items at each warehouse.
You need to apply FIFO costing per warehouse.
How should you complete the costing setup? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 196
A caulking manufacturer is implementing Dynamics 365 Supply Chain Management. When caulking is produced, it is sold by tubes, 1-gallon cans, 5-gallon buckets, 55-gallon drums, or 330-gallon totes with potential to add other sizes.
The manufacturer wants to ensure that when new units are added, only one conversion is set up that does not require conversions between each unit of measure.
You need to configure the unit of measure to meet the requirement.
What should you use?

  • A. Base unit
  • B. Conversion formula
  • C. Formula layout
  • D. Unit class

Answer: A

Explanation:
Explanation
Helpful in unit conversions without need to define all conversions to and from with this unit and other units in same unit class.
Base unit - Set this option to Yes to use the current unit as the base unit for its unit class. In this case, you only have to specify the conversion factor between the base unit and each additional unit in the unit class. The system can then convert between all units in that unit class. Therefore, it's easier to set up conversions.
For example, if gallon is the base unit for the Volume unit class, you only have to set up conversion factors from quart to gallon and from pint to gallon. The system can then also convert from quart to pint.
You can have only one base unit per unit class.
Reference: https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/tasks/manage-unit-measure


NEW QUESTION # 197
You need to meet the operational requirements for VendorB.
What should you do? To answer, select the appropriate options in the area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 198
A manufacturing company uses Dynamics 365 Supply Chain Management. The company plans to move to the new Planning Optimization functionality.
Several processes are no longer operating as expected.
You need to identify any missing functionality and the number of records impacted.
Which tool should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/master-planning/planning-optimization/planning-op


NEW QUESTION # 199
A company is implementing Dynamics 365 Supply Chain Management. The company uses subcontracted services on its bills of material (BOMs).
You must set up and release a subcontractor item so that it can be included on the BOM and subcontractor charges are included in the BOM calculation. Because the subcontractor is a step included in a BOM but not a tangible item, inventory for the item must not be tracked in the warehouse.
You need to set up the subcontractor item and release the item to the company.
What should you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 200
You need to determine the costing versions for the requirements.
Which costing versions should you use? To answer, drag the appropriate costing versions to the correct requirements. Each costing version may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation
Box 1: Planned
If a vendor can no longer deliver the raw materials for the energy drinks due to supply chain issues, the costs for using an alternative vendor to source the raw materials should be used to determine the impact on profits.
Planned costs
A costing version can contain a set of planned cost records about items and manufacturing processes. A costing version that contains planned costs is often used to support cost calculation simulations, such as simulations of the effect that cost changes to purchased materials or manufacturing processes has on the calculated costs of manufactured items. The item cost records for planned costs can also be used to support an actual cost inventory model by providing the initial values for item costs. These values include the calculation of planned costs for manufactured items.
Box 2: Standard
The profitability for nutritional supplements manufacturing processes needs to be expressed in terms of the cost categories for routing operations and the calculation formulas for manufacturing overheads.
Standard costs
A costing version can support a standard cost inventory model for items, where the costing version contains a set of standard cost records about items and manufacturing processes. Cost data about manufacturing processes is expressed in terms of the cost categories for routing operations and the calculation formulas for manufacturing overheads.
Reference: https://docs.microsoft.com/en-us/dynamics365/supply-chain/cost-management/costing-versions


NEW QUESTION # 201
You need to complete the shipments.

  • A. Confirm the load and generate packing slips and bills of lading.
  • B. Confirm shipments and generate pick/put work.
  • C. Create waves to generate work for shipping loads and send an ASN.
  • D. Create work for printing shipping documents and send an ASN.

Answer: C

Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/warehousing/wave-processing
Topic 3, Adventure Works Cycles
This is a case study. Case studies are not timed separately. You can use as much exam time as you would like to complete each case. However, there may be additional case studies and sections on this exam. You must manage your time to ensure that you are able to complete all questions included on this exam in the time provided.
To answer the questions included in a case study, you will need to reference information that is provided in the case study. Case studies might contain exhibits and other resources that provide more information about the scenario that is described in the case study. Each question is independent of the other questions in this case study.
At the end of this case study, a review screen will appear. This screen allows you to review your answers and to make changes before you move to the next section of the exam. After you begin a new section, you cannot return to this section.
To start the case study
To display the first question in this case study, click the button. Use the buttons in the left pane to explore the content of the case study before you answer the questions. Clicking these buttons displays information such as business requirements, existing environment, and problem statements. If the case study has an All Information tab, note that the information displayed is identical to the information displayed on the subsequent tabs. When you are ready to answer a question, click the button to return to the question.
Background
Adventure Works Cycles builds stock and custom mountain bikes and is headquartered in San Diego. It has the following assembly and warehouse locations:
* Denver, Colorado, United States
* San Diego, California, United States
* Budapest, Hungary
Most manufacturing is outsourced, with each facility only assembling the bikes. Parts are stocked at all facilities and may be transferred between warehouses or legal entities. All of the parts are at standard cost.
Current environment. Organizational structure
The following diagram shows the structure of Adventure Works Cycles.
* Each of the physical locations in the United States (US) is a warehouse.
* Hungary assembles and distributes products to the rest of the European Union (EU).
* The EU legal entity is expected to add additional warehouse locations.
* All legal entities roll up to a financial consolidation company.

Current environment. Purchasing
* Higher quality tires that are used in new orders have become popular. Due to the volume of orders, the company wants to negotiate pricing with VendorC. The vendor agrees to a discounted price for 500 tires purchased within the next six months. Once the 500 tires have been purchased, the discount will be re-evaluated based on demand.
* Once a purchase is approved, for audit purposes it cannot be changed.
* Whenever possible, parts are purchased from vendors also within the EU. A purchase order was placed for a bike seat manufacturer in Italy.
* Parts for custom orders may not always be kept in stock and will need to be procured.
Current environment. Purchasing requisitions
The following flow chart depicts the purchase requisition process:

Requirements. Purchasing
* Items for purchase requisitions are governed by each country. Each of the country-specific products will be grouped together for selection.
* Purchase orders must follow the requisition process.
* All existing purchase orders for brakes must account for the change to VendorB.
Requirements. Inventory
* Standard costs are based on purchase fluctuations within a single month.
* Tires use floating zones due to limited warehouse space.
Requirements. Operations
Due to recent brake failures, Adventure Works Cycles plans to purchase brakes from VendorB instead of VendorA. Although the brakes from Vendor B will continue to use the same item number as the brakes from VendorA, the price is slightly higher from VendorB. Adventure Works Cycles will pay list price from VendorB. The order for VendorB needs approval and the usual approver for purchase requisitions is on vacation.
All brakes from VendorA that are in stock must be tested. The process for brake testing must be implemented for all inbound orders. Quality orders must be automatically created upon receipt of the first shipment against a purchase order only.
UserC needs to consolidate brake inventory after it has been cleared for sale.
Ordering of the new brakes order will incur an additional cost because it is a rush order.
Requirements. Custom orders
* Custom orders are placed for items that do not exist in the item master.
* Hungary does not process custom orders.
* The United States does process custom paint orders. Most custom paint colors are special order and require purchase requisitions.
* Quotes must be obtained from a minimum of two suppliers per company policy and compared for the shipping, costs, and other variables. Quotes will not be selected based on lowest price only.
Issues
* A special order for 26 high-end tires is received. This item is no longer in stock from the current vendor.
* Goods have been received in stock, but the matching invoice has not yet been received at the time of month close.
* UserA needs to set up pricing for the items purchased from VendorC and ensure that accounting validates the receipt and invoice against the agreement.
* UserB needs to send out a request for quotation (RFQ) for custom paint. The vendor will be selected based on pricing, volume discounts, and lead time.


NEW QUESTION # 202
A company is designing a new bicycle by using a dimension-based Bill of materials (BOM).
The configuration groups have been defined and created.
You need to set up a BOM for the new bicycle.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/dimension-based-product-configuration


NEW QUESTION # 203
A company is designing a new bicycle by using a dimension-based Bill of materials (BOM).
The configuration groups have been defined and created.
You need to set up a BOM for the new bicycle.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation

Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/dimension-based-product-configuration


NEW QUESTION # 204
A company uses procurement in Dynamics 365 Supply Chain Management.
You need to select the correct system functionalities to meet the company's requirements.
Which system functionalities should you select? To answer, drag the appropriate system functionalities to the correct business requirements. Each system functionality may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:
Explanation


NEW QUESTION # 205
You are a functional consultant for a company named Contoso Entertainment System USA (USMF).
You need to configure a new quality process for item number M0017. The process must meet the following requirements:
* Perform an impedance test on 100 percent of the units purchased.
* Initiate the test after the product receipt is posted.
To complete this task, sign in to Dynamics 365 portal.

Answer:

Explanation:
See explanation below.
Explanation
Configure Item Sampling to specify 100 percent of the units.
Configure Quality Association to specify what test to run and configure the test to run after the receipt is posted.
Configure Item Sampling.
* Go to Inventory management > Setup > Quality control > Item sampling.
* Click New.
* In the Item sampling field, type the name 100%.
* In the Description field, type a value (100%).
* In the Quantity specification field, select percent.
* In the Value field, enter a number (100)
* Click Save.
* Close the page.
Configure a Quality Association
* Go to Inventory management Quality associations.
* Click New.
* In the Reference type field, select
* In the Item code field, select Table.
* In the Item field, select the item M0017.
* In the Event type field, select Product Receipt.
* In the Execution field, select After.
* Expand or collapse the Specifications section.
* In the Test group field, find and select the Impedance test.
* Click Save.
* Close the page.
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/inventory/tasks/set-up-quality-orders
https://docs.microsoft.com/en-us/dynamics365/supply-chain/inventory/enable-quality-management


NEW QUESTION # 206
......

Trend for MB-330 pdf dumps before actual exam: https://www.troytecdumps.com/MB-330-troytec-exam-dumps.html

Real Exam Questions and Answers - Microsoft MB-330 Dump is Ready: https://drive.google.com/open?id=1zsKI2M6HYjRvWUMuCyJji31e6tsgGtSg