NEW QUESTION # 12
Which operations can the responsible person perform after a maintenance order is technically completed? Note: There are 3correct answers to this question.

  • A. Update the estimated costs
  • B. Create an invoice receipt for delivered materials.
  • C. Lock or unlock the order.
  • D. Change the planned costs.
  • E. Change the settlement rule.

Answer: B,C,E


NEW QUESTION # 13
You are analyzing the data transfer of the cost center of an equipment. What are the possible data origins? Note: There are 2correct answers to this question.

  • A. The cost center of the related maintenance work center
  • B. The individual maintenance of the cost center in the equipment master record
  • C. The cost center of the superior equipment
  • D. The reference functional location of the superior functional location

Answer: B,C


NEW QUESTION # 14
Which parameter in the material master is a prerequisite for refurbishment?

  • A. Valuation class 8000
  • B. Valuation type H (origin)
  • C. Valuation category C (condition-based)
  • D. Valuation category B (in-house/external procurement)

Answer: C


NEW QUESTION # 15
You need to create a new functional location. Which actions can you perform with the SAP Fiori app Create Technical Object? Note:There are 3 correct answers to this question.

  • A. Assign documents.
  • B. Assign a subordinate piece of equipment.
  • C. Change a reference location.
  • D. Edit classification data and characteristics.
  • E. Create a measuring point.

Answer: A,D,E


NEW QUESTION # 16
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.

  • A. Factory calendar
  • B. Scheduling period
  • C. Start date
  • D. Scheduling indicator

Answer: B,C


NEW QUESTION # 17
Which steps are available for the maintenance technician when using the Report Malfunction tile? Note: There are 3 correct answersto this question.

  • A. Add a URL to provide further information.
  • B. Input estimated costs for repair malfunction.
  • C. Display the current location of the technical object.
  • D. View details of the technical object by navigating to the Asset Viewer.
  • E. Select and print the maintenance order shop papers.

Answer: A,C,D


NEW QUESTION # 18
Which objects have been enhanced with linear data in maintenance processes? Note: There are 3 correct answers to this question.

  • A. Measurement document
  • B. Maintenance plan item
  • C. Maintenance plan header
  • D. Work order confirmation
  • E. Equipment task list

Answer: A,B,D


NEW QUESTION # 19
You want to assign components to an equipment task list. There isno BOM assigned to the equipment. What is the prerequisite for using the free assignment of material?

  • A. Assign the header material of a material BOM as assembly to atask list operation.
  • B. Assign the header material of a material BOM to the equipmenttask list header.
  • C. Free assignment of material is always possible without any prerequisites.
  • D. Assign the BOM usage for free assignment of material in Customizing.

Answer: D


NEW QUESTION # 20
You want to see historical information relating to the phases when equipment was installed at a functional location. Where can you find this information?

  • A. Structure Display
  • B. Location Analysis list
  • C. Usage list
  • D. Historical Orders list

Answer: C


NEW QUESTION # 21
You want to create a new functional location. Which configurationsteps are required? Note: There are 2 correct answers to this question.

  • A. Define the functional location category.
  • B. Define the number range for the functional location category.
  • C. Define the structure indicator.
  • D. Define the reference functional location.

Answer: A,C


NEW QUESTION # 22
You want to create a maintenance order with an external order operation with service items. Which of the following statements arecorrect? Note: There are 3 correct answers to this question.

  • A. The assignment of a control key with the service indicator set is mandatory.
  • B. The assignment of a control key with the service indicator set is mandatory.
  • C. The actual value entry can only be recorded via the service entrysheet.
  • D. The assignment of service master records to an order operation is optional.
  • E. The usage of a model service specification is mandatory.

Answer: A,B,C


NEW QUESTION # 23
Which parameter in a maintenance strategy do you use to set thestart/end date of the maintenance order?

  • A. Package offset
  • B. Package hierarchy
  • C. Call horizon
  • D. Initial/subsequent buffer

Answer: D


NEW QUESTION # 24
Which of the following BOMs we use to set up spare parts planning of functional locations

  • A. Maintenance BOM
  • B. Costing BOM
  • C. Production BOM
  • D. construction BOM

Answer: A


NEW QUESTION # 25
The maintenance technician wants to document the finished work steps for a technical object in a notification. Which catalog-based option in the notification can be used?

  • A. A text in the subject long text screen
  • B. An entry in the object list
  • C. An activity in the notification header
  • D. A task in the notification item

Answer: C


NEW QUESTION # 26
What happens if you change the primary key of a functionallocation?

  • A. The functional location is immediately assigned to a new superior functional location when the new label is entered.
  • B. The user must define a new labelling system for the new primary key.
  • C. The user must decide whether the functional location is assigned to a new superior functional location.
  • D. Changing the superior functional location via alternative labeling is not possible.

Answer: A


NEW QUESTION # 27
Which of the following objects can you directly assign when you define the work center? Note: There are 2 correct answers to this question.

  • A. Organizational unit (HR)
  • B. Fixed price of the activity type
  • C. Capacity category
  • D. Calculation key

Answer: A,C


NEW QUESTION # 28
A piece of equipment cannot be linked to a material. Determine whether this statement is true or false.

  • A. True
  • B. False

Answer: B


NEW QUESTION # 29
Which activities can the planner perform by using the Maintenance Planning Overview app with the default filters? Note:There are 3 correct answers to this question.

  • A. Analyze maintenance orders that are still in planning andhave NOT been released.
  • B. Display approved purchase requisitions for which purchase orders have been generated.
  • C. Analyze confirmed maintenance orders that have NOT been settled.
  • D. Analyze overdue maintenance orders that have NOT been finally confirmed.
  • E. Display approved purchase requisitions for which NO purchase orders have been generated.

Answer: A,C,E


NEW QUESTION # 30
You want to set up a general maintenance task list for inspectionrounds using the overall time confirmation as a simplified way torecord measurement documents. What do you need to do? Note: There are 2 correct answers to this question.

  • A. Assign an inspection lot to the task list header.
  • B. Assign a piece of equipment with an allocated measuring point to a task list operation.
  • C. Assign a measuring point as a production resources/tools(PRT) to a task list operation.
  • D. Assign an inspection document as PRT to the task list operation.

Answer: B,C


NEW QUESTION # 31
How do you set up the visible tiles for a specific user in SAP Fiori launchpad? Note: There are 2 correct answers to this question.

  • A. By assigning a PFCG role with an SAP Fiori catalog
  • B. By assigning a PFCG role with an SAP Fiori tile group
  • C. By assigning a portal role with an SAP Fiori catalog
  • D. By assigning the tiles directly

Answer: A,B


NEW QUESTION # 32
What can be determined using the offset within a maintenancestrategy?

  • A. The first due date of a maintenance package
  • B. The cycle duration
  • C. The call date for the maintenance order
  • D. The start date of the maintenance order

Answer: A


NEW QUESTION # 33
......


SAP C-TS413-2021 certification exam is designed to test the knowledge and skills of individuals seeking to become certified as SAP Application Associates in the area of SAP S/4HANA Asset Management. Certified Application Associate - SAP S/4HANA Asset Management certification is ideal for professionals who work with SAP Asset Management solutions and want to demonstrate their expertise in this area. Passing C-TS413-2021 exam is an essential step towards becoming a certified SAP professional and advancing your career in the SAP ecosystem.

 

Study HIGH Quality C-TS413-2021 Free Study Guides and Exams Tutorials: https://www.troytecdumps.com/C-TS413-2021-troytec-exam-dumps.html

New C-TS413-2021 Actual Exam Dumps,  SAP Practice Test: https://drive.google.com/open?id=14yYRjO3sGRWe64HcRwiXm5A0rgTtxUSA