NEW QUESTION # 66
What factors MUST be considered when designing and drawing rack elevation diagrams?
Response:

  • A. User mobility, competence of the technician, quality of the rack material
  • B. Amount of RJ-45 connectors used, amount of conduit used
  • C. Equipment manufacturer, model year of equipment, number of USB ports
  • D. Ergonomics, weight distribution, RF and IR reception, heat loads, signal separation

Answer: D


NEW QUESTION # 67
In AV system design, what is the purpose of a "commissioning plan"?

  • A. To describe equipment warranties
  • B. To outline the testing and verification process after installation
  • C. To schedule user training sessions
  • D. To specify power requirements

Answer: B


NEW QUESTION # 68
For light coming directly from a source such as a lightbulb, what measure and instrument should be used?
Response:

  • A. Footcandle with a light impedance meter
  • B. Lux with an incident meter
  • C. Candela with an incident meter
  • D. Foot lambert with an STL

Answer: C


NEW QUESTION # 69
In AV design, what is the primary advantage of using fiber optic cables over copper?

  • A. Immunity to electromagnetic interference and longer transmission distances
  • B. Easier termination
  • C. Lower cost
  • D. Higher weight

Answer: A


NEW QUESTION # 70
Which of the following signals can coexist in one conduit without interference?
[Developing AV Designs/Create draft AV design]
Response:

  • A. Data network and line-level audio
  • B. Speaker level audio and serial control
  • C. Video and microphone-level audio
  • D. Serial control and video

Answer: D


NEW QUESTION # 71
Which of the following is an example of an AV industry trade organization?

  • A. OSHA
  • B. AVIXA
  • C. IEEE
  • D. FCC

Answer: B


NEW QUESTION # 72
Which of the following best describes "RTSP" in video streaming?

  • A. A digital video format
  • B. A projector specification
  • C. A type of camera
  • D. Real-Time Streaming Protocol used for controlling streaming media servers

Answer: D


NEW QUESTION # 73
Which of the following best describes "plenum-rated" cable?

  • A. Cable with extra shielding for audio signals
  • B. Cable for outdoor use
  • C. Cable for temporary installations
  • D. Cable rated for use in air handling spaces with fire-resistant materials

Answer: D


NEW QUESTION # 74
What is the purpose of a "kick-off" meeting in an AV project?

  • A. To train end users
  • B. To finalize equipment installation
  • C. To start project planning and align stakeholders
  • D. To conduct system testing

Answer: C


NEW QUESTION # 75
Which of the following are associated with sound pressure levels?
(Select all that apply.)
Response:

  • A. Is typically measured in decibels (dB SPL)
  • B. Can most accurately be measured with a Class 0 precision SPL meter
  • C. Is the ultimate method for quantifying background noise levels
  • D. Eliminates distortion in speech reinforcement

Answer: A,B


NEW QUESTION # 76
Which tool is used to create detailed system wiring diagrams?

  • A. Spreadsheet
  • B. Word processor
  • C. CAD software
  • D. Presentation software

Answer: C


NEW QUESTION # 77
How do you confirm the AV System has been built and delivered as per the client's scope?
Response:

  • A. Confirm with the client or owner that warranty documentation has been received.
  • B. Generate an RFI to the architect or general contractor.
  • C. Training has been completed with end users along with turnover of O&M Manuals.
  • D. Compare the As-Built drawings and commissioning report to the performance specifications.

Answer: D


NEW QUESTION # 78
According to the ANSI/INFOCOMM 3M-2011 standard, Projected Image System Contrast Ratio, what is the minimum contrast ratio of basic decision-making tasks?
Response:

  • A. 50:1
  • B. 15:1
  • C. 7:1
  • D. 80:1

Answer: B


NEW QUESTION # 79
In an AV system, what is the main benefit of using a matrix switcher?

  • A. To increase audio power
  • B. To convert signals from analog to digital
  • C. To amplify video signals
  • D. To route multiple inputs to multiple outputs flexibly

Answer: D


NEW QUESTION # 80
When is the commissioning phase of the project?
Response:

  • A. When the AV system conceptual design is created
  • B. While determining the project goals and needs
  • C. While preparing the schematic design
  • D. When the construction work is at or near completion

Answer: D


NEW QUESTION # 81
What is the advantage of converting an analog signal to digital?
Response:

  • A. Digital signals carry audio and video feeds that analog will not.
  • B. Digital signals can address signal degradation, storage, and recording issues.
  • C. Digital signals are more energy efficient to broadcast.
  • D. Digital signals have more signal headroom.

Answer: B


NEW QUESTION # 82
What is the required bandwidth for 4:1:1 progressive digital video signal (1920 × 1080, 8 bits at 30 Hz)?
Response:

  • A. 1.49 Gbps
  • B. 1.30 Gbps
  • C. 746 Mbps
  • D. 3.30 Gbps

Answer: C


NEW QUESTION # 83
......


AVIXA CTS-D - Design Exam Syllabus Topics:

TopicWeight
Duty A: Conducting a Needs Assessment16.8%
Task 1: Identify Decision-makers and Stakeholders1.6%
Task 2: Identify Skill Level of End Users2.4%
Task 3: Educate AV Clients1.6%
Task 4: Review Client Technology Master Plan3.2%
Task 5: Identify Client Expectations4%
Task 6: Identify Scope of Work4%
Duty B:Coordinating with Other Professionals to Develop Project Documentation23.2%
Task 1: Review A/E (architectural and engineering) drawings4%
Task 2: Coordinate with architectural/interior design professionals4%
Task 3: Coordinate with Mechanical Professionals1.6%
Task 4: Coordinate with Structural Professionals1.6%
Task 5: Coordinate with Electrical Professionals3.2%
Task 6: Coordinate with lighting professionals2.4%
Task 7: Coordinate with IT and network security professionals4.0%
Task 8: Coordinate with acoustical professionals1.6%
Task 9: Coordinate with life safety and security professionals0.8%
Duty C: Developing AV Designs48%
Task 1: Create Draft AV Design10.4%
Task 2: Confirm site conditions8%
Task 3: Produce AV infrastructure drawings12%
Task 4: Produce AV system drawings12%
Task 5: Finalize Project Documentation5.6%


AVIXA CTS-D Exam Certification Details:

Number of Questions135
Duration180 mins
Passing Score350 / 500
Sample QuestionsAVIXA CTS-D Sample Questions
MemberExam Price$475(USD)
Exam CodeCTS-D

 

The New CTS-D 2026 Updated Verified Study Guides & Best Courses: https://www.troytecdumps.com/CTS-D-troytec-exam-dumps.html

Authentic CTS-D Exam Dumps PDF - 2026 Updated: https://drive.google.com/open?id=1c8-7ocC5nf1wGLos9UrUoTmhteiP4o2q